15. SUBSTITUTIONS
A. The Base Bid is predicated on compliance with the Drawings and Specifications
without substitutions.
B. The Bidder may offer substitutions for any item noted in the Specifications, with
the exception of Form of Contract, General Conditions and General Requirements - Division 1,
by listing in the space below the proposed substitution, together with the amount to be deducted
from the Base Bid if the substitution is accepted.
C. The Owner reserves the right to accept or reject any proposed substitution.
D. The sum stated includes any modifications of work or additional work that may
be required due to acceptance of substitution. Substitute materials must be approved and
accepted by the Owner in writing before same may be used in lieu of those named in the
Specifications.
Item and Specification
Description of Reference Deduction from Base
Bid
Substitution Section & Page No. Labor Material
Addendum No. 3 COST PROPOSAL FORM BF-11