Page 14 - Barr&Barr_Cost Proposal
P. 14

16.    BIDDING DOCUMENTS

                          The Bidder acknowledges receipt of the following Bidding Documents and affirms that
                   all costs associated therewith are included in the Guaranteed Maximum Cost, Alternates and Unit
                   Prices:

                          A.     Guaranteed Maximum Cost Contracts Instructions to Bidders, Pages 1 through 8.


                                     •   Evaluation Factors Pages 1 through 9
                                     •   Hotel Foundation List of Contractors (Informational ONLY)

                          B.     Guaranteed Maximum Cost Contracts Cost Proposal Form, Pages 1 through 21.

                          C.     General   Conditions for  Guaranteed Maximum Cost       Contracts, dated
                                 June 23, 2017, Pages 1 through 57, and Exhibits A through G.

                          D.     General  Requirements for   Guaranteed  Maximum    Cost  Contracts dated
                                 June 23, 2017, as enumerated in the Table of Contents.

                          E.     Cornell University Form of Agreement for Guaranteed Maximum Cost Contracts
                                 dated June 2017, Articles 1 through 11.


                           F.    Specifications  consisting of Divisions and Sections as indexed therein dated
                                 June 23, 2017, as prepared by SNØHETTA        ARCHITECTURE      DESIGN
                                 PLANNING PC, the Architect.


                          G.     Drawings, as indexed and prepared by SNØHETTA ARCHITECTURE DESIGN
                                 PLANNING PC, the Architect, dated June 23, 2017.







































                   Addendum No. 3                  COST PROPOSAL FORM                               BF-12
   9   10   11   12   13   14   15   16   17   18   19