18.    UNIT PRICE SCHEDULE

                          The following Unit Prices are proposed for additions to or deletions from the work.  The
                   Undersigned hereby proposes the Unit Prices be used for this project in accordance with Article
                   11 of the General Conditions.  Upon acceptance by Cornell University, the completed Unit Price
                   Schedule will become part of the contract arising from this Proposal.  The Guaranteed Maximum
                   Cost will be adjusted for Unit Price work changes that may be incorporated in the Work over the
                   duration of the Contract as determined by Cornell University and the Architect in accordance
                   with Article 11 of the General Conditions.

                          The increase or decrease in the Guaranteed Maximum Cost shall represent the difference
                   in quantity multiplied by applicable Unit Price, which shall  include  all  charges  for  labor,
                   material, waste factor, handling, delivering, storing,  restocking,  fees,  general expenses, taxes,
                   insurance, labor burdens, engineering, shop drawings, small tools, field and office supervisory
                   personnel, overhead and profit.


                                  UNIT PRICE                           ADD                 DEDUCT
                   EXCAVATION
                   A-1        Mass excavation, CY *            $                     $
                                                                    40                    34
                   A-2        Structure excavation, CY *       $                     $
                                                                    60                    51
                   A-3        Utility trench excavation, CY  *  $                    $
                                                                    100                   85
                   A-4        Removal of unsuitable soil from   $                    $
                              site, CY **                           65                    40
                   A-5        Removal of contaminated soil     $                     $
                              from site, CY  **                     85                    60
                   A-6        Import controlled fill, CY       $                     $
                                                                   105                    85
                   A-7        Compacted backfill, CY           $                     $
                                                                   105                    85
                   A-8        Stone sub-base, CY               $                     $
                                                                   105                    85
                   ROCK REMOVAL
                   B-1        Rock ripping, CY                 $      0              $     0

                   B-2        Rock removal w/hydraulic impact   $    0               $     0
                              tool, rubber tire backhoe, CY
                   B-3        Rock removal w/hydraulic impact   $                    $
                              tool, tracked backhoe, CY              0                     0
                   B-4        Break rock - Hard sound rock 60   $   1,100            $
                              TSF, CY                                                     N/A
                   B-5        Break rock - Medium hard rock 40  $                    $
                              TSF, CY                               900                    N/A
                   B-6        Break rock - Intermediate rock 20   $   700            $
                              TSF, CY                                                      N/A
                   B-7        Break rock - Soft rock - weathered  $                  $     N/A
                              8 TS, CY                             500
                      * Excludes Trucking and Disposal
                      ** Trucking and Disposal Only