•   LEED analysis/suitability of materials and components:   CONSTRUCTING MOCK-UPS
                Assessment of LEED Scorecard selection viabilities. Comparison   In many cases, especially in areas of special materials and
                of specifi ed products for compatibility, reliability and related   fi nishes, it is essential as part of the preconstruction process to
                cost implications.                                    construct mock-ups of design items and building systems. Th is
                                                                      enables the owner, the designer, the engineering team, and the
              •   Coordinate with end users for schedule requirements for their   user to allow for physical review of size, shape and materials of
                FFE deliveries and installation dates.                the design components and assemblies. Th  ese mock-ups will
                                                                      help everyone involved to thoroughly understand the design
               All information will be analyzed with input/feedback from every   and the intricacies of the proposed systems and will expedite
               team member reviewed. Final documentation will be issued to   the designer’s ability to complete working drawings.
               the team either as a separate study or within the Project Planning
               Analysis at the end of each design stage.              IN-HOUSE BUILDING INFORMATION MODELING (BIM)
                                                                      As on any project featuring Building Informational Modeling
                                                                      (BIM) integration, a project specifi c BIM execution plan
               SCHEDULING
                                                                      delineates the roles and responsibilities of each party, the
               REALISTIC AND AIRTIGHT
               Barr & Barr will support the client by providing project scheduling   detail and scope of information to be shared, relevant business
               either in support of the provided master plan schedule or as the   processes and related supporting software. Th is collaborative
               primary scheduling entity. At a minimum, we will provide a   process begins as design documentation is shared with Barr &
               Critical Path Method (CPM) schedule with a baseline throughout   Barr for BIM implementation.
               the entire project as well as other breakout schedules as required
               for planning and managing the project.                   • Resolve Physical Collisions
                                                                        • Site Logistical Planning
               ESTIMATING
                                                                        • Quantity Take-Off  Verifi cation
               IN-HOUSE ESTIMATING
               Barr & Barr will prepare detailed construction cost estimates   • Construction Schedule Analysis
               throughout the preconstruction period (schematic design, design
               document and construction document stages as dictated). We will
               establish cost monitoring and cost control measures to ensure the
               project meets all budget parameters. Where cost estimates exceed the
               targeted budget, we will provide options and alternatives to reduce
               cost and maintain fi scal control. Our cost modeling estimates will
               be produced in fully-detailed UNIFORMAT© as well as CSI©
               trade format as required by the team to best serve the development
               analysis of the project. We include our detail sheets, breakdowns,
               comparisons, and verifi cations as part of our deliverable package.
               All pricing information is made available to the preconstruction
               stakeholders. Additional estimating items covered:

                •  Value Management Studies
                •  Permit & Approvals
                •  Foster Local as well as MBE/WBE subcontractor
                  participation to meet any Campus standards
                •  Assist in meeting all Sustainability/LEED goals for
                  project
                •  Subcontracts & Bidding Procedures
                      - Ensure complete project scope coverage.
                      - Reduce allowances.
                      -  Entice subcontractor bidding with desirable scopes and
                       values.
                      -  Foster SDO certifi ed MBE/WBE participation to
                       meet set standards.
                      - Streamline scope out and contracting periods.