Page 4 - LEED PLANNING DOCUMENT JL
P. 4

Performance (required), Building Level             to help ensure patient care and satisfaction.
               Energy Metering (required), Fundamental            For a possible 5 points, the following
               Refrigerant Management (required),                 categories were included: Minimum Indoor
               Enhanced Commissioning, and Optimize               Air Quality (required), Environmental
               Energy Performance. It is understood that          Tobacco Smoke Control (required), Thermal
               by applying this categories to the                 Comfort, Quality Views, and Acoustic
               renovation project, the hospital hopes to          Performance.
               incorporate energy reduction as a whole by
               utilizing renewable sources and energy             Innovation
               efficient technology.                              St. Joseph’s seeks to earn their LEED

               Materials and Resources                            accreditation by implementing the
                                                                  following strategies for Innovation: 95% of
               The hospital at St. Joseph’s Women’s               the original building is salvageable and can
               Center intends to apply for credit in the          be reused, education outreach programs for
               following areas for a possible earning of 7        new mothers will be hosted here, and that
               points. Storage and Collection of                  the gardens shall be maintained through
               Recyclables (required), Construction and           the use of natural organic pest reduction
               Demolition Waste Management Planning               methods. In addition, the principal designer
               (required), PBT Source Reduction- Mercury          for this project has achieved a status of
               (required), Building Life Cycle Impact             LEED AP BD+C, and her expertise in this
               Reduction, Furniture and Medical                   area shall be utilized through the beginning
               Furnishings. With these strategies in place,       and duration of construction.
               the result will be an overall reduction in use
               of harmful materials and proper reuse and          Regional Priority
               disposal of waste collected on site.               Based on the region with zip code 30033,

               Indoor Environmental Quality                       St. Joseph’s is able to seek further credit for
                                                                  Rainwater Management, Cooling Tower
               Because St. Joseph’s Women’s Center is a           Water Use, Outdoor Water Use Reduction
               Health Care building, it is considered vital       and Indoor Water Use Reduction for a
               that it meet several of these requirements         possible 12 points.



















                                                              4
   1   2   3   4   5   6   7   8   9