Page 9 - LEED PLANNING DOCUMENT JL
P. 9

SUSTAINABLE SITES



                   In this category, JL Interiors will                   ASTM E 1527-05 description. It

                   explain in detail how it meets the                    was determined that there was
                   requirements for the points listed                    some contamination suspected
                   below. The firm is applying for five                  from the chemicals utilized for

                   points under Sustainable Sites.                       the carpet manufacturing
                                                                         process, and therefore a Phase
                   •  Construction Activity Pollution
                       Prevention- An erosion control                    II Environmental was

                       plan will be developed by a                       conducted based on the ASTM
                       certified professional and                        E 1903-11. Contamination was
                                                                         found around the floor drains
                       implemented during all phases

                       of land disturbance activities to                 as well as in the soil
                                                                         immediately surrounding the
                       prevent land runoff and water
                       pollution from soil. The means                    site. Necessary steps to
                                                                         remediate the site in order to
                       of control used for this purpose

                       will be established through a                     meet national standards have
                       series of vegetation or grasses,                  been taken, and the site is now
                       that integrate with the sites                     considered safe to renovate

                       surroundings and incorporates                     and operate.
                       a natural aspect that may be                  •  Open Space- A garden will be
                       appreciated by patients who                       established toward the back of

                       can see this portion of the site                  the hospital to provide patients
                       from their windows once the                       and guests a place for positive
                       project is completed.                             distraction and reflection. It

                   •    Environmental Site                               will encompass 30% of the
                       Assessment- A Phase I                             total campus. Professional
                                                                         landscapers will incorporate
                       Environmental Site Assessment
                       has been conducted based on                       30% of vegetation through the



                                                              9
   4   5   6   7   8   9   10   11   12   13   14