Page 114 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 114
Investigation Report Application Form Examination of Day 22: Oct 25 Applications should After posting Judicial
(Fill-up) documents / CARPETA) be received by the form
– Land Examiner Typing of Judicial Forms → records Typing
6 Checked and Verified by
Engr., LMO I and Chief
LPPDs
Judicial form typing Ocular Inspection Typing of Judicial Form Day 23: Oct 26 Posting the Engineer signature for
(Status at the area) – Typist applications for 15 the technical
7 J??? → Request of Order of calendar days description
Issuance signed by CENRO
Signatories Order of Payment Verification of Technical Day 23: Oct 26 After posting, the For examination of
(Payment of Fees Description / Accuracy Brgy certification LMOs
and doc Stamps) and affix signature if Signature of CENRO in should be issued
8 found compliant – CARPETAS
Geodetic Engineer
Transmit to PENRO Receive by the Final Verification of Day 24: Oct 27 Judicial form typing Back to records for
Records Officers documents and patent numbering
Records, recommendations for Transmittal to PENRO
Numbering, transmittal to PENRO –
Indexing DMO III (RAS)
Applicant
Request –
Certification for
Taxation
9
a. Received the
Request for
Taxation
b. Preparation and
approved of
certification
c. Releasing of
Certificate
68