Page 112 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 112

Received by R.O.   Q & A   Verification of survey   DAY 3 – 4: Oct 5-6, 2016   Request for ground   Give applications
 claimant – Records                  inspection /           forms
 Officer   Conduct Investigation / Ocular  verification     •    Require the
    Inspection of the lot applied                                applicant
 3                                                               supporting
                                                                 documents to
                                                                 support  his/her
                                                                 claim


 Posting (15 days)   Verify the   Posting (Nov. 9 – 24,   DAY 5 – 20: Oct 7 -21, 2016   After the inspection   Submit the application
 documents   2016)                   Judicial form          to record officer
 submitted   Posting of Notice to the   unapplied or
    Barangay Level                   unpatented require
 4                                   the applicant the

                                     supporting
                                     documents




 Ocular Inspection /   Findings /   Inspection – actual   Day 21: Oct 24, 2016   File the applications  Post the applications
 Geo Tagging   Diagnosis   inspection of the area           for 15 calendar days
    being applied   Secure Barangay Posting
 a.  5a. Only   Certification
 Barangay
 Capt. Cert as
 actual
 occupant and
 technical
 description
 5   b.  5b. Verify lot
 no at the
 records whose
 the claimant
 c.  5c. Public
 Land as
 Survey
 Claimant
















                                                                                  67
   107   108   109   110   111   112   113   114   115   116