Page 108 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 108

Annex C Summary of Delays and Costs

 Table 10. Summary of Delays and Costs


    Systematic   Sporadic                                     ROD Registration
                                                                   and Title
 Adjudication   Adjudication   Subdivision Survey   CENRO Processing   PENRO Processing   Distribution


 Delays   1.  Preparation of the   1.  Verification of   1.  Securing of lot maps   1.  Verification of   There is no SOP for   1.  Compliance with
 Lot Status Report.   availability for titling.   and Lot Data   availability for titling   PENRO to inform the   requirements for
 2.  Preparation of the   2.  Submission of   Computation form   2.  Research on Total   applicants that their free   Registration.
 Consolidated   required supporting   DENR.   Landholdings   patents have been   2.  Securing RPT
 Cadastral Map.   documents.   2.  Conduct of survey.   3.  Checking of the   issued.   clearance from the
 3.  Submission of   3.  Approval of   Technical                LGU.
 required supporting   subdivision survey.   Description by the   3.  Securing new Tax
 documents.   4.  Release of approved   Geodetic Engineer.      Declaration.
 subdivision survey to                                       4.  Encoding in the LRA.
 lot occupant.                                               5.  Claiming of
                                                                registered title.
                                                             6.  Sending out of
                                                                notices to title
                                                                holders.












 Costs   1.  “Package deals”      1.  Conduct of survey

 cost is based on GE
 tariff.