Page 111 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 111
Received by R.O. Q & A Verification of survey DAY 3 – 4: Oct 5-6, 2016 Request for ground Give applications
claimant – Records inspection / forms
Officer Conduct Investigation / Ocular verification • Require the
Inspection of the lot applied applicant
3 supporting
documents to
support his/her
claim
Posting (15 days) Verify the Posting (Nov. 9 – 24, DAY 5 – 20: Oct 7 -21, 2016 After the inspection Submit the application
documents 2016) Judicial form to record officer
submitted Posting of Notice to the unapplied or
Barangay Level unpatented require
4 the applicant the
supporting
documents
Ocular Inspection / Findings / Inspection – actual Day 21: Oct 24, 2016 File the applications Post the applications
Geo Tagging Diagnosis inspection of the area for 15 calendar days
being applied Secure Barangay Posting
a. 5a. Only Certification
Barangay
Capt. Cert as
actual
occupant and
technical
description
5 b. 5b. Verify lot
no at the
records whose
the claimant
c. 5c. Public
Land as
Survey
Claimant
67