Page 107 - Property Rights in the Philippine A Time and Cost Study_July 2017
P. 107
Annex C Summary of Delays and Costs
Table 10. Summary of Delays and Costs
Systematic Sporadic ROD Registration
and Title
Adjudication Adjudication Subdivision Survey CENRO Processing PENRO Processing Distribution
Delays 1. Preparation of the 1. Verification of 1. Securing of lot maps 1. Verification of There is no SOP for 1. Compliance with
Lot Status Report. availability for titling. and Lot Data availability for titling PENRO to inform the requirements for
2. Preparation of the 2. Submission of Computation form 2. Research on Total applicants that their free Registration.
Consolidated required supporting DENR. Landholdings patents have been 2. Securing RPT
Cadastral Map. documents. 2. Conduct of survey. 3. Checking of the issued. clearance from the
3. Submission of 3. Approval of Technical LGU.
required supporting subdivision survey. Description by the 3. Securing new Tax
documents. 4. Release of approved Geodetic Engineer. Declaration.
subdivision survey to 4. Encoding in the LRA.
lot occupant. 5. Claiming of
registered title.
6. Sending out of
notices to title
holders.
Costs 1. “Package deals” 1. Conduct of survey
cost is based on GE
tariff.
65