Page 159 - Barbara Merry - The Splicing Handbook
P. 159

Roll the spike back from position 3 (C) to the start of the service (mark 1),
               position 1 in (D), and simultaneously gently pull back the slack out of the wire.
                  Insert  the  marlinspike  over  the  heart  at  mark  1  (D)  and  pick  up  only  two
               strands  of  the  standing  part  this  time.  Rotate  the  marlinspike  as  before  so  it

               travels  down  the  wire.  Insert  Strand  2  (the  strand  next  to  Strand  1)  of  the
               working end at the same place as Strand 1, but exit the standing part one strand
               farther away from the beginning of the service (mark 1). Roll the spike back,
               close to mark 1. With Strand 3, pick up only one strand. Remember to have it
               enter at the same spot as Strands 1 and 2.
   154   155   156   157   158   159   160   161   162   163   164