Page 667 - Chief Architect Reference Manual
P. 667
Chapter 19:
Schedules and Object
Labels
A schedule is similar to a simple Text object • Schedule Defaults
with grid lines separating rows and columns, • The Schedule Tools
but are dynamically linked to objects in your • Create Schedule from Room
plan and automatically update whenever an • Editing Schedules
object is created, deleted, moved, or altered. • Schedule Numbering
• Columns and Objects to Include
Schedules are available for doors, windows, • Custom Fields
cabinets, fixtures, framing objects, furniture, • Find Object in Plan
electrical items, plants, and rooms. Each • Working with Multiple Schedules
schedule can contain information for one or • Schedule Specification Dialog
all floors of your plan.
• Object Labels
Schedules are highly customizable, so you • Label Panel
should check each schedule that you create to • Object Information Panel
be sure it presents the information that you
want it to.
A variety of objects in Chief Architect have
labels that display information about them in
floor plan and cross section/elevation views.
Some of those objects also have schedules
associated with them and may display
schedule callout labels.
Chapter Contents
667