Page 671 - Chief Architect Reference Manual
P. 671

Schedule Numbering



                               tabbed text object. You can then edit the   schedule’s specification dialog will no longer
                               schedule as text.                       be present.

                               When a schedule is converted to text, it no
                               longer updates automatically. In addition,   You  can  copy  the  text  from  the  Text
                               shaped labels displaying as specified in the   Specification  dialog  and  paste  it  into
                                                                        other applications.


                          Schedule Numbering

                               By default, schedule numbering is dependent   Editing Schedule Order
                               on the order in which objects are placed in
                               the plan, as well as the floor they are on.   If a schedule’s order does not meet your
                                                                       needs, you can change it in either of two
                               •  Any objects present in your plan before a   ways:
                                  schedule is created will be listed first in
                                  ascending alphanumeric order, according   •  Using the schedule’s Move Row edit han-
                                  to their Label information.             dles. See “Using the Edit Handles” on
                                                                          page 670.
                               •  A new, unique objects placed in the plan
                                  after the schedule is created will be added   •  Using an object’s Move Up in Schedule
                                  to the bottom of the schedule in the order   and Move Down in Schedule edit tools.
                                  that they are placed, regardless of its   When an item in a schedule is moved to a
                                  Label information.                   different row, its schedule Number will
                               When an object is edited, its schedule   change, as will that of any other item whose
                               number may or may not change:           position is affected by that move.
                               •  If an object with a Quantity of 1 in the      When a given object is included
                                  schedule is edited, its position in the       in only one schedule, its position
                                  schedule will not change.            in that schedule can be modified using the
                                                                       Move Up in Schedule and Move Down in
                               •  If a group of objects listed on the same   Schedule edit tools.
                                  row in a schedule are edited simultane-
                                  ously, their position will not change.
                                                                             Renumber Schedule
                               •  If an object listed on the same row in a
                                  schedule with other similar objects is    To remove any gaps in numbering that
                                  edited so that it is no longer similar    might have been created when objects
                                  enough to share the same row, it will   were edited or deleted, select the schedule
                                  move to the bottom of the schedule. See   and click the Renumber Schedule edit
                                  “Columns and Quantity” on page 672.  button.








                                                                                                       671
   666   667   668   669   670   671   672   673   674   675   676