Page 675 - Chief Architect Reference Manual
P. 675
Schedule Specification Dialog
• Special Door or Window Schedules can If you create multiple schedules of the same
be prepared for Energy Ratings, Fire type, bear in mind that it is possible for
Doors or other information. different objects in those schedules to be
assigned the same callout number. To avoid
If you intend to use schedule callout labels, it this, consider specifying different callout
is best to avoid including a given object in prefixes and/or callout shapes.
more than one schedule. If you choose to do
so, the object will display a separate callout For more information about customizing
label for each schedule it is included in. schedules, refer to the Chief Architect
Knowledge Base at chiefarchitect.com.
Schedule Specification Dialog
Schedules and the object labels The Schedule Specification dialog is
associated with them can be edited in similar to the specification dialogs for layout
the Schedule Specification dialog. To open tables. See “Layout Page and Revision
this dialog, either select a schedule and click Tables” on page 1316.
the Open Object edit button or double-click
The options in these dialogs are also similar
the schedule using the Select Objects to those found in their corresponding
tool. Schedule Defaults dialogs.
675