Page 67 - TECHNICAL SPECIFICATION FOR PALM OIL REFINING_rev.1 - Copy_Float
P. 67
OFFER NO. KMIPL/P16E0097R7
100 TPD PHYSICAL REFINERY AND FRACTIONATION
Page No. 67/69
Battery Limits of Fractionation
1. Soft Water to be provided at cooling tower pond
2. Condensate will be left over at outlet of condensate header
3. Electric power 3 phases 415 volts to be provided at incomer of sectional
control panel.
4. Any other equipment and services not expressly mentioned in our offer
are also excluded from our scope of supply (except required within battery
limits for guaranteed performance of plant).