Page 65 - TECHNICAL SPECIFICATION FOR PALM OIL REFINING_rev.1 - Copy_Float
P. 65
OFFER NO. KMIPL/P16E0097R7
100 TPD PHYSICAL REFINERY AND FRACTIONATION
Page No. 65/69
8. Upon completion of the shipment of the equipment, Kumar will provide
two (2) sets of manuals containing operating manuals for the Kumar
process system(s), assembly drawings and manuals of all major
purchased components, and assembly drawings of all Kumar designed
equipment. All manuals will be in the English language.
9. All documentation will be in the English language.
10. KMIPL has the right to modify the design in order to improve the
performances, to facilitate maintenance of the Equipment or for other
technical reasons. However these modifications shall not affect the
performances and consumptions of the Equipment. In case any
modifications are requested by the BUYER, for good performance of the
plant the modifications requested will be put into operation only after the
implications thereof are agreed to by the KMIPL.