Page 65 - TECHNICAL SPECIFICATION FOR PALM OIL REFINING_rev.1 - Copy_Float
P. 65

OFFER NO. KMIPL/P16E0097R7
                                                      100 TPD PHYSICAL REFINERY AND FRACTIONATION
                                                                                              Page No. 65/69




                    8.   Upon completion of the shipment of the equipment, Kumar will provide

                        two (2)  sets of manuals containing operating manuals for  the Kumar
                        process system(s), assembly drawings and manuals  of all major

                        purchased components, and assembly  drawings of all Kumar designed

                        equipment.  All manuals will be in the English language.


                    9.   All documentation will be in the English language.


                    10. KMIPL has the right to modify the design in order to improve the

                        performances, to facilitate maintenance of the Equipment  or for other

                        technical reasons. However these modifications shall not affect the
                        performances and consumptions of the Equipment. In case any

                        modifications are requested by the BUYER, for good performance of the
                        plant the modifications requested will be put into operation only after the

                        implications thereof are agreed to by the KMIPL.
   60   61   62   63   64   65   66   67   68   69