Page 614 - Facilities Master Plan 2016
P. 614

Lodi Unified School District                                            Lodi Unified School District
          Elkhorn School                                                          Elkhorn School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                             Project Cost Summary (2016$) - Elkhorn School                           Project Cost Summary (2016$) - Elkhorn School
                                                       Construction Costs   Total Project                                     Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
          12 Safety, Security & Campus Control             $              736,000 $                    979,000  17 Technology Infrastructure  $                 64,000 $                      64,000
            12a  Remaining asbestos removal             10,350 sf  $                 4.00 $              41,000   17c MDF and IDF data rooms with environmental control
            12b Safety improvements to and/or new parent/bus drop-off areas and parking  (direct cost only)                         2 ea  $       32,000.00 $              64,000
            12b.3 Entry Plaza                     2,400 sf  $               26.00
            12b.6 Resurface and Repair Access Road                6,500 sf  $                 8.10 $              53,000
            12b.9 Repair existing Parking Lot             26,250 sf  $                 6.30 $            165,000  Total Construction/Project Cost (2016$)  $         10,250,000  $13,611,000
            12b.11 New concrete walkways                2,600 sf  $               15.00 $              39,000
            12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $              40,000
            12e Safety locks at classroom doors                     10 ea  $             449.00 $                 4,000  The following items are excluded from this budget:
            12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $              32,000  Utility hook-up fees & City connection fees.
            12g Marquee Sign                              1 ea  $       10,000.00 $              10,000  Offsite work and traffic signals.
            12h Fencing with controlled campus entrances                          Land acquisition costs.
            12h.2 Decorative Metal Fencing & Gates                   515 lf  $             252.00 $            130,000  Hazardous material surveys, abatement, and disposal.
            12h.3 Rolling Decorative Metal Gate                        2 ea  $       27,000.00 $              54,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             10,350 sf  $                 5.40 $              56,000
            12i.2 Emergency Lighting             10,350 sf  $                 1.40 $              14,000
            12j New public address/emergency communication
            systems                            10,350 sf  $                 7.60 $              79,000
            12k Intrusion alarms               10,350 sf  $                 1.80 $              19,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $                       -  $                             -
            14a Main Student Quad
            14a.2 New Main Student Quad             16,000 sf  $               17.25
            14b Learning Courts
            14b.2 New Learning Court                5,600 sf  $               20.70
           15 Exterior Play Spaces, Playfields & Hardcourts  $                       -  $                             -
            15b PE Play Yard & Hardcourts
            15a.1 New Rubberized Surface Play Area                2,400 sf  $               20.00
            15b.3 Relocate Elementary Play Apparatus                        1 ea  $       18,000.00
            15b.4 Shade Structure                 2,400 sf  $               90.00
            15b.6 New Hardcourts               55,800 sf  $               11.00
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       38,000.00
            15c Playfields
            15c.1 Repair Playfields           120,000 sf  $                 3.00
            15d Baseball/Softball Fields
            15d.3 Pitching mound/bases, per field                        1 ea  $       22,000.00
            15d.4 Backstops, per field                        1 ea  $       27,000.00
             Not included in this Facilities Needs Assessment
           16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -
            16a Flexible furniture (Per Classroom, Direct Cost)                        4 ea  $       15,000.00



         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  585
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District