Page 610 - Facilities Master Plan 2016
P. 610

Lodi Unified School District                                            Lodi Unified School District
          Creekside Elementary School                                             Creekside Elementary School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                         Project Cost Summary (2016$) - Creekside Elementary School              Project Cost Summary (2016$) - Creekside Elementary School
                                                       Construction Costs   Total Project                                      Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
          11 Library & Student Support Services            $                       -  $                             -  16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -
            11a Elementary School Library/Innovation Lab                           16a Flexible furniture (Per Classroom, Direct Cost)                     18 ea  $       15,000.00
            11a.4 Reconfigure Library/Innovation Lab Building                3,100 sf  $             244.00
            11d Learning Center
            11d.4 Reconfigure Learning Center                1,760 sf  $             237.00  17 Technology Infrastructure         $                       -  $                             -
                                                                                   Not included in this Facilities Needs Assessment
          12 Safety, Security & Campus Control             $              931,000 $                 1,238,000
            12b Safety improvements to and/or new parent/bus drop-off areas and parking  Total Construction/Project Cost (2016$)  $           8,086,000  $10,754,000
            12b.1 New Parking Lot              60,650 sf  $               16.00 $            485,000 (Reconfigure @ 50%)
            12b.3 Entry Plaza                     6,000 sf  $               26.00
            12b.11 New concrete walkways                5,800 sf  $               15.00 $              87,000  The following items are excluded from this budget:
            12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $              40,000  Utility hook-up fees & City connection fees.
            12e Safety locks at classroom doors                     30 ea  $             449.00 $              13,000  Offsite work and traffic signals.
            12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $              32,000  Land acquisition costs.
            12g Marquee Sign                              1 ea  $       10,000.00 $              10,000  Hazardous material surveys, abatement, and disposal.
            12h Fencing with controlled campus entrances                           Escalation (Costs are in 2016$ calculated to the end of the year).
            12h.2 Decorative Metal Fencing & Gates                   785 lf  $             252.00 $            198,000
            12h.3 Rolling Decorative Metal Gate                        1 ea  $       27,000.00 $              27,000
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             21,926 sf  $                 5.40
            12i.2 Emergency Lighting             21,926 sf  $                 1.40
            12j New public address/emergency communication
            systems                            21,926 sf  $                 7.60
            12k Intrusion alarms               21,926 sf  $                 1.80 $              39,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $                       -  $                             -
            14a Main Student Quad
            14a.2 New Main Student Quad             16,025 sf  $               17.25
            14b Learning Courts
            14b.2 New Learning Court                5,400 sf  $               21.85
           15 Exterior Play Spaces, Playfields & Hardcourts  $              153,000 $                    203,000
            15a Kindergarten Play Yard
            15a.1 New Rubberized Surface Play Area                2,250 sf  $               20.00 $              45,000
            15a.3 Shade Structure                 1,200 sf  $               90.00 $            108,000
            15b PE Play Yard & Hardcourts
            15a.1 New Rubberized Surface Play Area                9,425 sf  $               20.00
            15b.2 Elementary Play Apparatus                        1 ea  $       63,000.00
            15b.4 Shade Structure                 2,400 sf  $               90.00
            15b.5 Resurface & Repair Hardcourts             48,575 sf  $                 5.00
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       25,333.33
            15c Playfields
            15c.1 Repair Playfields           180,825 sf  $                 3.00


         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  581
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District
   605   606   607   608   609   610   611   612   613   614   615