Page 610 - Facilities Master Plan 2016
P. 610
Lodi Unified School District Lodi Unified School District
Creekside Elementary School Creekside Elementary School
Facilities Master Plan - Total Program Cost Facilities Master Plan - Total Program Cost
Opinion of Probable Cost 19-Apr-16 Opinion of Probable Cost 19-Apr-16
Project Cost Summary (2016$) - Creekside Elementary School Project Cost Summary (2016$) - Creekside Elementary School
Construction Costs Total Project Construction Costs Total Project
Item Quantity Unit Unit Cost Subtotal Total Cost 25% (x 1.33) Item Quantity Unit Unit Cost Subtotal Total Cost 25% (x 1.33)
11 Library & Student Support Services $ - $ - 16 Next Generation Classroom Flexibility (Furniture) $ - $ -
11a Elementary School Library/Innovation Lab 16a Flexible furniture (Per Classroom, Direct Cost) 18 ea $ 15,000.00
11a.4 Reconfigure Library/Innovation Lab Building 3,100 sf $ 244.00
11d Learning Center
11d.4 Reconfigure Learning Center 1,760 sf $ 237.00 17 Technology Infrastructure $ - $ -
Not included in this Facilities Needs Assessment
12 Safety, Security & Campus Control $ 931,000 $ 1,238,000
12b Safety improvements to and/or new parent/bus drop-off areas and parking Total Construction/Project Cost (2016$) $ 8,086,000 $10,754,000
12b.1 New Parking Lot 60,650 sf $ 16.00 $ 485,000 (Reconfigure @ 50%)
12b.3 Entry Plaza 6,000 sf $ 26.00
12b.11 New concrete walkways 5,800 sf $ 15.00 $ 87,000 The following items are excluded from this budget:
12d Exterior lighting to ensure student safety 1 ls $ 40,000.00 $ 40,000 Utility hook-up fees & City connection fees.
12e Safety locks at classroom doors 30 ea $ 449.00 $ 13,000 Offsite work and traffic signals.
12f Signage for emergency response and wayfinding 1 ls $ 32,000.00 $ 32,000 Land acquisition costs.
12g Marquee Sign 1 ea $ 10,000.00 $ 10,000 Hazardous material surveys, abatement, and disposal.
12h Fencing with controlled campus entrances Escalation (Costs are in 2016$ calculated to the end of the year).
12h.2 Decorative Metal Fencing & Gates 785 lf $ 252.00 $ 198,000
12h.3 Rolling Decorative Metal Gate 1 ea $ 27,000.00 $ 27,000
12i Fire safety equipment, fire alarms and emergency lighting
12i.1 Fire Alarm System 21,926 sf $ 5.40
12i.2 Emergency Lighting 21,926 sf $ 1.40
12j New public address/emergency communication
systems 21,926 sf $ 7.60
12k Intrusion alarms 21,926 sf $ 1.80 $ 39,000
13 District Support Facilities $ - $ -
Not included in this Facilities Needs Assessment
14 Outdoor Learning Environments & Quads $ - $ -
14a Main Student Quad
14a.2 New Main Student Quad 16,025 sf $ 17.25
14b Learning Courts
14b.2 New Learning Court 5,400 sf $ 21.85
15 Exterior Play Spaces, Playfields & Hardcourts $ 153,000 $ 203,000
15a Kindergarten Play Yard
15a.1 New Rubberized Surface Play Area 2,250 sf $ 20.00 $ 45,000
15a.3 Shade Structure 1,200 sf $ 90.00 $ 108,000
15b PE Play Yard & Hardcourts
15a.1 New Rubberized Surface Play Area 9,425 sf $ 20.00
15b.2 Elementary Play Apparatus 1 ea $ 63,000.00
15b.4 Shade Structure 2,400 sf $ 90.00
15b.5 Resurface & Repair Hardcourts 48,575 sf $ 5.00
15b.8 Basketball Court/Sports Equipment 1 ls $ 25,333.33
15c Playfields
15c.1 Repair Playfields 180,825 sf $ 3.00
Prepared by: LPA, Inc. / Cumming Prepared by: LPA, Inc. / Cumming
6.3 APPENDIX Facilities Master Plan 581
DETAILED PRIORITIZED COST ESTIMATE Lodi Unified School District