          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                         Project Cost Summary (2016$) - Woodbridge Elementary School            Project Cost Summary (2016$) - Woodbridge Elementary School
                                                       Construction Costs   Total Project                                      Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
            10b Staff Collaboration/Work Rooms
            10b.2 Modernize Staff Collaboration/Work Rooms                   820 sf  $             118.00  16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -
            10b.3 Reconfigure Staff Collaboration/Work Rooms                   600 sf  $             235.00  16a Flexible furniture (Per Classroom, Direct Cost)                     16 ea  $       15,000.00
          11 Library & Student Support Services            $                       -  $                             -  17 Technology Infrastructure  $                       -  $                             -
            11a Elementary School Library/Innovation Lab                           Not included in this Facilities Needs Assessment
            11a.2 New Library/Innovation Lab Building                4,290 sf  $             406.00
            11a.5 Sitework & Site Improvements                4,290 sf  $               38.00
            11d Learning Center                                                   Total Construction/Project Cost (2016$)         $           5,095,750  $6,777,000
            11d.4 Reconfigure Learning Center                1,736 sf  $             237.00
                                                                                  The following items are excluded from this budget:
          12 Safety, Security & Campus Control             $           1,692,000 $                 2,250,000  Utility hook-up fees & City connection fees.
            12a  Remaining asbestos removal             29,160 sf  $                 4.00 $            117,000  Offsite work and traffic signals.
            12b Safety improvements to and/or new parent/bus drop-off areas and parking  Land acquisition costs.
            12b.1 New Parking Lot              32,550 sf  $               16.00 $            521,000  Hazardous material surveys, abatement, and disposal.
            12b.11 New concrete walkways                4,150 sf  $               15.00 $              62,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $              40,000
            12e Safety locks at classroom doors                     30 ea  $             449.00 $              13,000
            12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $              32,000
            12g Marquee Sign                              1 ea  $       10,000.00 $              10,000
            12h Fencing with controlled campus entrances
            12h.2 Decorative Metal Fencing & Gates                1,370 lf  $             252.00 $            345,000
            12h.3 Rolling Decorative Metal Gate                        2 ea  $       27,000.00 $              54,000
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             29,160 sf  $                 5.40 $            157,000
            12i.2 Emergency Lighting             29,160 sf  $                 1.40 $              41,000
            12j New public address/emergency communication
            systems                            29,160 sf  $                 7.60 $            222,000
            12k Intrusion alarms               29,160 sf  $                 1.80 $              52,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $                       -  $                             -
            14b Learning Courts
            14b.2 New Learning Court                8,000 sf  $               21.85
           15 Exterior Play Spaces, Playfields & Hardcourts  $                       -  $                             -
            15a Kindergarten Play Yard
            15a.1 New Rubberized Surface Play Area                2,400 sf  $               20.00
            15a.3 Shade Structure                 1,200 sf  $               90.00
            15b PE Play Yard & Hardcourts
            15a.1 New Rubberized Surface Play Area                3,000 sf  $               20.00
            15b.7 Slurry Coat & Stripe Existing Hardcourts             49,600 sf  $                 3.00
            15c Playfields
            15c.1 Repair Playfields             57,200 sf  $                 3.00



         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  631
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District
   655   656   657   658   659   660   661   662   663   664   665