Page 662 - Facilities Master Plan 2016
P. 662

Lodi Unified School District                                            Lodi Unified School District
          Delta Sierra Middle School                                              Delta Sierra Middle School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                          Project Cost Summary (2016$) - Delta Sierra Middle School               Project Cost Summary (2016$) - Delta Sierra Middle School
                                                       Construction Costs   Total Project                                      Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
            11d Learning Center
            11d.3 Modernize Learning Center                1,200 sf  $             119.00  Total Construction/Project Cost (2016$)  $           8,544,000  $11,352,000
            11d.4 Reconfigure Learning Center                1,292 sf  $             237.00
                                                                                  The following items are excluded from this budget:
          12 Safety, Security & Campus Control             $              792,000 $                 1,053,000  Utility hook-up fees & City connection fees.
            12b Safety improvements to and/or new parent/bus drop-off areas and parking  Offsite work and traffic signals.
            12b.1 New Parking Lot              46,500 sf  $               16.00 $            372,000 Reconfig. Pkg. @ 50%  Land acquisition costs.
            12b.11 New concrete walkways                4,300 sf  $               15.00 $              65,000  Hazardous material surveys, abatement, and disposal.
            12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $              40,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12e Safety locks at classroom doors                     40 ea  $             449.00 $              18,000
            12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $              32,000
            12g Marquee Sign                              1 ea  $       10,000.00 $              10,000
            12h Fencing with controlled campus entrances
            12h.2 Decorative Metal Fencing & Gates                   570 lf  $             252.00 $            144,000
            12h.3 Rolling Decorative Metal Gate                        1 ea  $       27,000.00 $              27,000
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             46,812 sf  $                 5.40
            12i.2 Emergency Lighting             46,812 sf  $                 1.40
            12j New public address/emergency communication
            systems                            46,812 sf  $                 7.60
            12k Intrusion alarms               46,812 sf  $                 1.80 $              84,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $                       -  $                             -
            14a Main Student Quad
            14a.2 New Main Student Quad                7,988 sf  $               11.50  50% of cost
            14b Learning Courts
            14b.2 New Learning Court             13,600 sf  $               19.55
           15 Exterior Play Spaces, Playfields & Hardcourts  $                       -  $                             -
            15b PE Play Yard & Hardcourts
            15b.4 Shade Structure                 2,400 sf  $               90.00
            15b.7 Slurry Coat & Stripe Existing Hardcourts             19,200 sf  $                 3.00
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       25,333.33
            15c Playfields
            15c.1 Repair Playfields           222,600 sf  $                 3.00
            15h DG Track                          1,860 lf  $               97.00
           16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -
            16a Flexible furniture (Per Classroom, Direct Cost)                     13 ea  $       15,000.00
           17 Technology Infrastructure                    $                 32,000 $                      32,000
             17c MDF and IDF data rooms with environmental control
            (direct cost only)                            1 ea  $       32,000.00 $              32,000



         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  633
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District
   657   658   659   660   661   662   663   664   665   666   667