Lodi Unified School District                                            Lodi Unified School District
          Bear Creek High School                                                  Bear Creek High School
          Facilities Master Plan - Total Program Cost                             Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16   Opinion of Probable Cost                                    19-Apr-16
                           Project Cost Summary (2016$) - Bear Creek High School                   Project Cost Summary (2016$) - Bear Creek High School
                                                       Construction Costs   Total Project                                      Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item     Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
          11 Library & Student Support Services            $                       -  $                             -  Total Construction/Project Cost (2016$)  $         15,279,000  $20,321,000
            11b Middle School/High School Library/Innovation Lab
            11b.3 Modernize Library/Innovation Lab                1,200 sf  $             122.00
            11b.4 Reconfigure Library/Innovation Lab                8,560 sf  $             244.00  The following items are excluded from this budget:
            11d Learning Center                                                    Utility hook-up fees & City connection fees.
            11d.3 Modernize Learning Center                1,000 sf  $             119.00  Offsite work and traffic signals.
                                                                                   Land acquisition costs.
                                                                                   Hazardous material surveys, abatement, and disposal.
          12 Safety, Security & Campus Control             $           4,349,000 $                 5,784,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12b Safety improvements to and/or new parent/bus drop-off areas and parking
            12b.1 New Parking Lot              51,500 sf  $               16.00 $            824,000
            12b.10 Slurry Coat & Stripe Existing Paving           249,450 sf  $                 2.00 $            499,000
            12d Exterior lighting to ensure student safety                        1 ls  $       60,000.00 $              60,000
            12e Safety locks at classroom doors                   150 ea  $             449.00 $              67,000
            12f Signage for emergency response and wayfinding                        1 ls  $       40,000.00 $              40,000
            12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System           162,280 sf  $                 5.40 $            876,000
            12i.2 Emergency Lighting           162,280 sf  $                 1.40 $            227,000
            12j New public address/emergency communication
            systems                          162,280 sf  $                 7.60 $         1,233,000
            12k Intrusion alarms             162,280 sf  $                 1.80 $            292,000
          13 District Support Facilities                   $                       -  $                             -
            Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads         $                       -  $                             -
            Not included in this Facilities Needs Assessment
           15 Exterior Play Spaces, Playfields & Hardcourts  $                       -  $                             -
            15b PE Play Yard & Hardcourts
            15b.4 Shade Structure                 3,600 sf  $               90.00
            15b.5 Resurface & Repair Hardcourts             30,875 sf  $                 5.00
            15c Playfields
            15c.1 Repair Playfields           102,075 sf  $                 3.00
            15d Baseball/Softball Fields
            15d.1 Baseball field - natural turf           530,785 sf  $                 6.50
            15g1 Field House Team Rooms                   950 sf  $             494.00
            15n Aquatic complex
            15n.5 Shade Structure                 2,400 sf  $               90.00
           16 Next Generation Classroom Flexibility (Furniture)  $                       -  $                             -
            16a Flexible furniture (Per Classroom, Direct Cost)                     81 ea  $       15,000.00
           17 Technology Infrastructure                    $                       -  $                             -
            Not included in this Facilities Needs Assessment




         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.3       APPENDIX                                                                                                    Facilities Master Plan  642
                   DETAILED PRIORITIZED COST ESTIMATE                                                                      Lodi Unified School District
   666   667   668   669   670   671   672   673   674   675   676