Page 154 - FreesStyler® Installation and Startup
P. 154
®
INSTALLATION AND STARTUP
Chapter 9 Optional “Add-On” Items
Water Softener
Bypass Valve System: Minimum 2” floor drain required. Inlet/Outlet header system should remain
the same size as the existing line(s).
Model 213S OD / WB
Non-softened water in Five field supplied Shutoff Valves
This line MUST be 2” @ 40PSI or or (normally open, close to bypass system)
less. It can be 1-1/2” @ 40PSI or Softened water
greater. The other lines are as follows: out
• WB, 1-1/4” or 1-1/2” copper tubing.
One field supplied Shutoff Valve
(normally closed, open to
bypass system)
Model 213S OD / WA Three field supplied Shutoff
Non-softened water in Valves (normally open,
close to bypass system)
These lines are to be 1-1/4” or 1-1/2”.
All copper tubing.
Softened water
out
One field supplied Shutoff Valve
(normally closed, open to
bypass system)
9-22 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL220