Page 37 - FreesStyler® Installation and Startup
P. 37
®
INSTALLATION AND STARTUP
Chapter 3 Getting Started
System Control Center (SCC) Panel Layout
It is best to position the SCC, MCC and all other equipment room and in-bay components first so
that the contractors can get started right away. See your site-specific prints for details.
REFER TO YOUR SUPPLIED ELECTRICAL PRINTS FOR DETAILS IN CHAPTER 25
(SUPPORT DOCUMENTS).
CAUTION
DO NOT punch ANY holes in the top of the enclosure. It may allow moisture to leak inside.
Doing so voids all warranties.