Page 37 - FreesStyler® Installation and Startup
P. 37

®
                       INSTALLATION AND STARTUP


                       Chapter 3 Getting Started


                       System Control Center (SCC) Panel Layout

                           It is best to position the SCC, MCC and all other equipment room and in-bay components first so
                           that the contractors can get started right away. See your site-specific prints for details.
                           REFER TO YOUR SUPPLIED ELECTRICAL  PRINTS  FOR  DETAILS IN CHAPTER 25
                           (SUPPORT DOCUMENTS).
                                                             CAUTION


                                DO NOT punch ANY holes in the top of the enclosure. It may allow moisture to leak inside.
                                                           Doing so voids all warranties.




                   Circuit Breakers

                          Drive
                    Communication                 24VDC
                         Module                   Power
                                                                                     GFCI
                           PLC
                       Explansion
                         Module








                                                                            Modem Transformer

                                                                              Output Board
                        Terminal
                           Strip




                          MCR
                     (Motor Control
                          Relay)

                         Ground
                       Terminals












                       1MANUL220            Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681      3-13