Page 20 - Wave Wrap™
        P. 20
     WAVE WRAP™
             Installation
             Utilities
                Water Connections
                    1)  From your water supply, insert  a  “TEE”  to supply water to the brass “TEES” on each of the
                       distribution blocks located on the WAVE WRAP™ booms.
                    2)  From the distribution block, run water lines to the leg manifolds and the head manifolds.
                                                     Overhead View
                                                                                 Distribution block
                                                                                     (typical)
                                                                                                   Main
                                                                                                   water
                                                                                                    In
                                                                        Water feed to             Water feed
                                                                       Head Manifold
                                                                                                   to Leg
                                                                                                  Manifold
                                                                                 Head manifold
                                                                                    (typical)
                                                                                               Water
                                                                                                In
                                        Water supply
                                                                                   Leg manifold
                                                                                     (typical)
                                                                                              Water
                                                                                                In
                    Note:  It is imperative that no foreign materials are in the
                           supply lines before final connections are made. To be
                           sure  of this, the lines should be blown out prior to
                           final hookup.
              18          Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681           1MANUL864





