Page 21 - Wave Wrap™
P. 21
WAVE WRAP™
Installation
Utilities
Pneumatic (Air) Connections
1) Run 1/4” airline from the CCU or Air Panel to the oil reservoir hooked up to the rod end side of the
cylinder. Driver side uses RED airline, passenger side used PURPLE airline. This step is for the
WAVE WRAP™ boom extend.
2) Run 1/4” airline from the CCU or Air Panel to port #3 on the WAVE WRAP™ limit switch. Driver
side uses GREEN airline, passenger side used ORANGE airline.
3) Run 1/4” airline from the CCU or Air Panel to the oil reservoir hooked to the backside of the
cylinder. Driver side and passenger side both use GRAY airline. This step is for the WAVE
WRAP™ boom retract.
Driver side Passenger side
Main air supply Main air supply
90-PSI minimum 90-PSI minimum
120-PSI maximum 120-PSI maximum
Cylinder
33” stroke Flow control valve Cylinder
6” stroke
Oil reservoir Oil reservoir
assembly assembly
Pneumatic valve heavy
duty limit switch
Flow control
Needle valve (leak valve
control)
Wave Wrap-T™ Boom Extend
From CCU or Air Panel
driver side RED, passenger side PURPLE
Wave Wrap-T™ Boom Retract
From CCU or Air Panel
driver side and passenger side GRAY
Wave Wrap-T™ Head
From CCU or Air Panel
driver side GREEN, passenger side ORANGE
1MANUL864 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 19