Page 18 - Single Arch
P. 18
SINGLE ARCH
Installation
Leak Test and Pendant Installation
1) Run water through the Arch and verify there are no leaks in any of the fittings.
2) Locate the supplied plastic pendant cap. Stretch it open and position it into place as shown below.
3) Locate the supplied tie-wraps and loop them through the holes in the top of the pendant as shown
below.
16 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 1MANUL710

