                       Installation


                       Arch Assembly

                              5)  Using the third joint block weldment, connect and secure the two head beams together as shown in
                                 the image.



























                              Note:  If you have a Utility Arch, proceed to the “Tunnel Placement” section. If you have Spray
                                     Arch, continue on to step #6.

                              6)  Lay the partially completed Arch on the ground. Place protective material between the ground and
                                 the Arch to keep it from getting scratched while you work on it.











                              7)  Spray Arch Only: Remove the top spray manifold assembly  from  the  skid. It should have the
                                 nozzle extensions and the barbed hose fittings already in place.





                                                                                                 Barbed Hose Fitting (2)


                                                                    Nozzle Extension (4)