CHAMELEON® ARCH SERIES


            Installation


            Additional Options: Dual K-Nozzle Manifolds

               Dual K-Nozzle Manifold Installation
                   21) Run the airlines through the half section of nylon protective sleeve for each leg. Refer to
                       the images below for more detail.

                   Note:  Make sure that the nylon protective sleeve is positioned so that it is not allowing the airlines
                          to rub any of the edges at the slotted area of the filler strip.












                                         Position the
                                         sleeves here to       Position the
                                         prevent the          sleeves here
                                         airlines from          to prevent
                                         rubbing against       the airlines
                                         the filler strip.    from rubbing
                                                               against the
                                                                filler strip.
                       .
                   22) Push the 3/8” airline that is coming from the main air feed union tee to the elbow that is
                       on the bottom of the side spray manifolds.

                   Note:  Route the airline to the elbow so that it is making a smooth transition from the point it
                          comes out of the filler strip to the connection point on the elbow as shown in the images
                          below.
                   23) Push the 3/8” airline that is coming from the main water/chemical feed union tee to the
                       elbow that is on the top of the side spray manifolds.

                   Note:  Route the airline to the elbow so that it is making a smooth transition from the point it
                          comes out of the filler strip to the connection point on the elbow as shown in the images
                          below.
                       At this point everything has been installed on the Arch.

                   24) Turn on the main water and run it through the lines. Check to make sure that there are no
                       leaks at any point on the system.