Page 55 - Chameleon® Arch Series
P. 55
CHAMELEON® ARCH SERIES
Installation
Additional Options: Dual K-Nozzle Manifolds
Dual K-Nozzle Manifold Installation
12) Remove the four 1/2” union tees from the accessory box. Run the field supplied, 1/2”
main air feed and the 1/2” main water/chemical feed through the top hole of the front
pendent cover and connect one to the top of each union tee.
13) Locate the three, one foot sections of nylon protective sleeve from the accessory box.
You will use two of the sections at each corner of the head beam. The third will be used
at the point where the airlines will come out of the filler strip at the bottom of each leg.
.
14) Remove the eight 3/8” stem adaptors from the accessory box. Plug one in each side of
the union tees and then run two lengths of the supplied 3/8 airlines to each side. Place
the airlines in the extruded side of the head beam and then through the nylon protective
sleeve that is at each corner of the head beam.
Stem Adaptor
.
Note: Make sure that the nylon protective sleeve is positioned so that it is not allowing the airlines
to rub any of the edges at the slotted area of the head beam corner.
15) Replace the rear cover of the pendant.
1MANUL526 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 51