Page 29 - Airblade® Dryer - Mix and Match
P. 29

AIRBLADE® DRYER Mix and Match



                       Installation


                       2-Nozzle Frame Assembly: Wall Mounted

                              4)  Once the brackets are on the head beam you can raise the head beam until it is 91” from
                                 the bottom of the head beam to the floor as shown below.







                                                            91”





                                                                   Floor

                              5)  Mark the upper center hole of one of the wall mount brackets. Drill the hole through the
                                 wall and fasten the bracket to the wall, leaving it just loose enough so that you can rotate
                                 it one way or the other. Use the image below for the proper assembly of the threaded
                                 rods to the wall.
                                 Note:  The rotation at this point can be done by using the forward/backward tilt available on
                                         the forklift.
                              6)  Stick a level going across the wall mount bracket, level it out, and mark the lower center
                                 hole of the wall mount bracket. Drill the hole through the wall and fasten the bracket to
                                 the wall. At this time you can tighten both of the center rods completely.
                              7)  Mark and drill through the wall for the other hole in the wall mount bracket and tighten the
                                 rods down completely.
                              8)  Place the level on the other end of the head beam, level it out, verify the 91” dimension
                                 from the floor to the bottom of the head beam and fasten the second wall mount bracket
                                 to the wall using the same guidelines you used for the first wall mount bracket.
                              9)  Before you tighten the remaining 8 fasteners that attach the wall mount brackets to the
                                 head beam, you will need to center the housings to the exit door of your bay. This can be
                                 done by either side shifting the head beam one way or the other or if the head beam can
                                 not go any further because it ran out of travel inside one of the wall mount brackets you
                                 will have to loosen the actual AirBlade® housing brackets and slide them one way or the
                                 other.

                              10) Capture the center line of the exit door and drop a plumb bob from the head beam down
                                 to the floor so that it is directly in line with the center of the doors. Make a mark on the
                                 head beam at this point.