Page 42 - Airblade® Dryer - Mix and Match
P. 42
AIRBLADE® DRYER Mix and Match
Installation
4-Nozzle “Select” Frame Assembly: Floor Mounted
Side Kick® Side Nozzles
3) Attach the Leg Pivot Assemblies to the inside of the upright legs as shown below. Do not
fully tighten into place until positioned at the height shown in the following step.
4) Secure the Leg Pivot Assemblies at 88” from the floor. The 88” dimension is taken from
the floor to the top of the Motor Mount Plate.
88”
The above stated height is a starting point. Your site may require a different position
depending on your site-specific cleaning requirements. Whenever making adjustments to
the recommended starting points, be sure to maintain adequate vehicle height and width
clearance.
38 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (810) 349-7010 * Fax (810) 380-9681 1MANUL011