                      Chapter 8 Wall Manifold / Optional Water Heater


                      Optional Water Heater Installation
                          The Super Heater is to be secured to the wall above the Pumping Station. Be sure it is on the
                          right side of the Wall Manifold and below the Wall Manifold height.

                                                       CAUTION

                             MUST BE MOUNTED BELOW HEIGHT OF THE WALL MANIFOLD!!!

                                                       CAUTION

                       DO NOT INSTALL THE WATER HEATER IN A LOCATION WHERE THE INTERNAL ENCLOSURE
                          TEMPERATURE CAN EXCEED 155ºF. IT SHOULD BE IN AN ENVIRONMENT WHERE THE
                                          AMBIENT TEMPERATURE IS BETWEEN 33º AND 135º.

                      Optional Water Heater Connections
                          The  following  explains  how  to  mount  the  Super  Heater  and  all  feeds  to  and  from  the  Wall
                          Manifold. Some items may differ from your site. See your site specific prints for details.
                          The Super Heater MUST be mounted as close to the Wall Manifold as possible. Like the Wall
                          Manifold, it MUST be in an area protected from freezing.
                          The  Super Heater MUST be mounted horizontally. Any other orientation will greatly reduce its
                          performance.

                             1)  Secure the Uni-Strut mounts to the wall or in the attic where the Super Heater will be located.
                             2)  Hang the Super Heater on the struts and clamp into place making sure the inlet hose barb is pointed down toward the
                                 floor.
                                                             Electrical Enclosure
                                      Temperature Gauge
                                (When system idle, gauge
                                    will show higher
                               temperature than set-point)





                                                                  3/4” water hose in from SDM
                               3/4” water out to                  Inlet Hose Barb MUST be
                                Wall Manifold                     pointed down


                                                   3/4” water hose to Drain

                          12kW Heating Element











                        1MANUL290       Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681   8-5