Page 15 - Foam-X® Spray Arch
P. 15
®
FOAM-X SPRAY ARCH
Installation
Manifold Installation
1) Locate the 2 Manifolds and 6 sets of clamps with the corresponding socket head
fasteners.
2) Secure the Manifolds to the frame as shown below.
1MANUL215 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 13