Page 15 - Foam-X® Spray Arch
P. 15

®
                       FOAM-X  SPRAY ARCH






                       Installation



                       Manifold Installation
                              1)  Locate  the  2  Manifolds and 6 sets of clamps with the corresponding socket head
                                 fasteners.
                              2)  Secure the Manifolds to the frame as shown below.




































































                       1MANUL215            Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681         13
   10   11   12   13   14   15   16   17   18   19   20