Page 16 - Foam-X® Spray Arch
P. 16
®
FOAM-X SPRAY ARCH
Installation
Utilities
1) Locate the supplied valve assemblies as shown below. There should be 4 of them.
2) Apply Teflon tape to the threads and screw them into the holes on the junction boxes as
shown below. Be sure they are angled at about 45° towards the exit of the tunnel.
3) Locate the 2 supplied sections of airline. One black and one natural colored. Also locate
the 2 supplied Tee’s and installed them as shown below.
4) Feed the appropriate airlines to the 2 Tee’s located atop the frame as shown below.
14 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL215