Page 14 - Quad Wave Mitter®
P. 14
®
QUAD WAVE MITTER
Installation
Frame Assembly
1) Place the head assembly in its approximate tunnel location. Using a fork lift, strap the head
assembly securely to the forks and raise above the height of the support legs.
Be sure to clamp or strap equipment securely to the forks of the fork lift before lifting
equipment. Do not stand under load while fork lift is in operation!
2) Locate the leg assemblies and secure them to the head assembly using the supplied bolts,
washer and nuts.
10 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL633