                       QUAD WAVE MITTER


                       Installation


                       Tunnel Placement

                       When placing a piece of equipment, tunnel depth will vary from site to  site.  Be  sure  to  allow  an
                                                                        ®
                       adequate operating envelope. The Quad Wave Mitter  can be installed facing either  direction  as
                       there is no entrance or exit side.
                          1)  Position the assembled unit in it’s permanent tunnel location.
                          2)  While placing a level on the vertical surface of one of the legs, place shims under the base
                              plate as needed to make the assembly level in both directions. Repeat this leveling process
                              on the other leg.

                              Note:  Shims not supplied by Belanger, Inc.
                          3)  Once the assembly is positioned correctly and level, lag it to the floor using the supplied lag
                              bolts.



                                                              DIRECTION
                                                                  of
                                                                TRAVEL






















                                                                Center
                                                                 Line
                                         45”

                                          The 45” dimension is taken from the inside edge of the inside conveyor guide rail to the outside edge of the equipment leg.