Page 17 - Quad Wave Mitter®
P. 17

®
                       QUAD WAVE MITTER


                       Installation


                       Utilities

                          Electrical



                              It is recommended that a licensed electrician is contracted to perform all electrical installations.
                              1)  Supply 3-phase power to the motor on top of the frame assembly.
                                                               Overhead View






                                                                 Water manifold

















                                   Main electrical feed

                                                                               Gearbox




















                                                                 Water manifold












                       1MANUL633         Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        13
   12   13   14   15   16   17   18   19   20   21   22