Page 43 - Gyro Wrap™ Signature ® Series
P. 43
GYRO WRAP™ Signature ® Series
Installation
Utilities
Wheel Rotation
Once both of the motors are wired up, turn the wheels on to verify that they are rotating in the
proper direction. The driver side should be spinning counter-clockwise and the passenger side
should be spinning clockwise. Use the image for more details on the correct wheel rotation.
Turn power off swap motor leads if necessary.
Once the motors are properly wired, install the plastic motor covers as shown below.
Position the plastic cover so that the Drill the supplied self-tapping screws
tabs are on the inside of the lower half into the tabs of the plastic cover
Rotation Direction
It is recommended that licensed technicians are contracted to perform all utility installations.
It is imperative that no foreign materials are in the supply lines before final connections are
made. To be sure of this, the lines should be blown out prior to final hookup.
All utilities MUST be installed in accordance with all local and national codes
Note: Be sure to match the wheel rotation shown below. If the rotation is opposite as show below,
reverse the electrical leads to the motor(s).
Note: It is imperative that no foreign materials are in the supply lines before final connections
are made. To be sure of this, the lines should be blown out prior to final hookup.
1MANUL248 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 39