Page 13 - Premium Tunnel Sign
P. 13
PREMIUM TUNNEL SIGN
Maintenance
Routine Procedures
• Bulbs may need to be replaced over a period of time. This is evident by dull letters. Remove the sign
face monthly to inspect bulbs. When replacing bulbs, ensure they are seated tightly in watertight fixture.
• It is recommended that the sign does not remain lit continuously for long periods of time, even though
the inside is well vented, this could lead to shorter life expectancy of the sign face.
• Clean sign face daily.
Note: An optional flashing control or other flashing circuit is recommended for use with the
sign to reduce the effect of constant heat.
1MANUL594 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 11

