Page 43 - Sudzer® BL & FM
P. 43

®
                       SUDZER  BL & FM



                       Chapter 3 Sudzer® BL Installation

                       Sudzer® BL Utilities

                          Electrical Connections: Wall Washers (Light Bars)
                          5)  Locate  the  quick  electrical  connectors  that  are  coming  out  of  the  Wall  Washers  and  Air
                              Plenum.  Apply a small amount of dielectric grease on the socket side of the connectors.

                          6)  Connect the electrical plug from the Wall Washers into the electrical receptors coming out of
                              the Air Plenum, as shown in the image below.

                          Electrical
                        Connection                                                           Electrical
                                                                                             Connection





                                                                                                      Air Plenum





                                                                                                      Wall Washer





                          Note: Apply a small amount of dielectric grease on the receptor side of the connector and push the
                                 connectors together making sure to align them for a proper seat.

                          7)  Wrap the connections with electrical tape to protect them from the car wash elements.
                          8)  Using the controller, turn on the Wall Washers to make sure they are working properly.

                          Connecting MixStir® to Sudzer® BL Bayonet Nozzles
                          At this point, the MixStir® Chemical Delivery Device should be in place and operational, and the
                          chemical line should be run from the device to the Sudzer®.

                           Note:  It  is  recommended  that  the  MixStir®  Chemical  Delivery  Device  be  installed  as  close  to  the
                                 Sudzer® BL as possible to ensure optimal performance.

                          1)  Turn on the MixStir® Device to verify that the chemical is getting out to the bay and to flush
                              out any unwanted debris that may be in the line.
                          2)  Connect the chemical feedline to the first Bayonet Nozzle fitting on the passenger side. If the
                              feedline is 1/2” in diameter the adapter fitting will need to be used to make the connection.

                                      Bayonet Nozzle Assembly






                                          Adapter Fitting



                       1MANUL026         Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681     3-17
   38   39   40   41   42   43   44   45   46   47   48