Page 198 - Revit Architecture Basics
P. 198
ANNOTATION
Task – Constraints
1. Navigate to ”1. Sal Annotation” and measure the suspended ceiling along grid line D
with Aligned Dimension
When the measurement chain ends, click on the EQ icon.
Then try moving one of the suspended ceilings in the east-west direction.
2. Measure the distance behind the door of the wall in one of the restrooms and click on the
padlock.
Use Align to get the opposite door to align and click on the padlock
3. Try then to first move the door and then moving wall.
198 NTI