3465  1000  1042  1423
                            MWHr


                            Electrical Energy Summary  Total generated capacity  Existing plant consumption  New plant consumption  Energy available for export











                           Personnel   Req. FTE  3  1  0.5  0


                           Total   mWhrs  134.4  768  96  16  28  1042.4

                           Total   kWhrs  134400  768000  96000  16000  28000


                           Hours    Operating  7000  3000  4000  2000  3500

                            Installed kW  24  320  30  10  10  Total





                                                    Est.
                                3,150,000.00  900,000.00  700,000.00  $100,000  130,000.00  150,000.00  100,000.00  200,000.00  200,000.00  200,000.00  500,000.00  150,000.00  6,480,000.00


                            Est cost  $       $          $          $          $          $          $          $          $          $          $          $
                7000  360  2520  3  1  1  1  1  1  1  1  1  1  1  1
                            Qty.












                Hours of Gasifier operation p.a. Stage 1 Fuel consumption kg/ hr  Stage 1 Fuel consumption kg / p.a.  Equipment required Burkhardt gasifiers  7 x 165kW, pellet fuel feeding conv, ash removal  conveyor, spares kit, commissioning Nova N‐Plus pellet mill complete including installation Nova press  runs for 12 hrs / day on nightshift Nova belt drier for woodchips 2.0 T / hr capacity Est. for heat pipe. No details as yet.  70m3 capacity, rotary valve, 4m dia. x











                                100  200  250  300  350  400
                            Item #
             NSFP ‐ ENERGY MASS BALANCE
                                2520  2520  0  25T
                            Tonnes
                Gasifiers to be Burkhardt 165kW modules running on 6mm dia pellets 3 x 165kW = 495kW / Hr of electrical energy 7 x 260kW = 780kW / Hr of Thermal energy Stage 1 will be 3x 165kW gasifiers.  Total 495kW El and 780kW Th  Stage 1 Fuel consumption Tonnes / year in the gasifier (120x 165kW)  Nova N‐Plus pellet press  Nova belt drier 2.0 T / hr capacity Pipe for heat transfer from TaAnn facility. 1.0MWTH  Dried chip storage silo #1  70m3 / 25 Tonne capacity  Stor
   6   7   8   9   10   11   12   13   14   15