Page 11 - NSFP Waste to Energy Solution 080218
P. 11
3465 1000 1042 1423
MWHr
Electrical Energy Summary Total generated capacity Existing plant consumption New plant consumption Energy available for export
Personnel Req. FTE 3 1 0.5 0
Total mWhrs 134.4 768 96 16 28 1042.4
Total kWhrs 134400 768000 96000 16000 28000
Hours Operating 7000 3000 4000 2000 3500
Installed kW 24 320 30 10 10 Total
Est.
3,150,000.00 900,000.00 700,000.00 $100,000 130,000.00 150,000.00 100,000.00 200,000.00 200,000.00 200,000.00 500,000.00 150,000.00 6,480,000.00
Est cost $ $ $ $ $ $ $ $ $ $ $ $
7000 360 2520 3 1 1 1 1 1 1 1 1 1 1 1
Qty.
Hours of Gasifier operation p.a. Stage 1 Fuel consumption kg/ hr Stage 1 Fuel consumption kg / p.a. Equipment required Burkhardt gasifiers 7 x 165kW, pellet fuel feeding conv, ash removal conveyor, spares kit, commissioning Nova N‐Plus pellet mill complete including installation Nova press runs for 12 hrs / day on nightshift Nova belt drier for woodchips 2.0 T / hr capacity Est. for heat pipe. No details as yet. 70m3 capacity, rotary valve, 4m dia. x
100 200 250 300 350 400
Item #
NSFP ‐ ENERGY MASS BALANCE
2520 2520 0 25T
Tonnes
Gasifiers to be Burkhardt 165kW modules running on 6mm dia pellets 3 x 165kW = 495kW / Hr of electrical energy 7 x 260kW = 780kW / Hr of Thermal energy Stage 1 will be 3x 165kW gasifiers. Total 495kW El and 780kW Th Stage 1 Fuel consumption Tonnes / year in the gasifier (120x 165kW) Nova N‐Plus pellet press Nova belt drier 2.0 T / hr capacity Pipe for heat transfer from TaAnn facility. 1.0MWTH Dried chip storage silo #1 70m3 / 25 Tonne capacity Stor