Hours of Gasifier operation p.a.  7000  360 Stage 1 Fuel consumption kg/ hr   2520 Stage 1 Fuel consumption kg / p.a.  Personnel   Total   Total   Hours    MWHr Electrical Energy Summary  Req. FTE  mWhrs  kWhrs Operating Installed kW  Est cost  Qty. Equipment required Burkhardt gasifiers  7 x 165kW, pellet fuel feeding conv, ash removal  conveyor, spares kit, commissioning  3465 Total generated capacity  3  134.4  134400  7000  24 3,150,000.00  $       3











                                100  200  250  300  350  400
                            Item #
             NSFP ‐ ENERGY MASS BALANCE
                                2520  2520  0  25T
                            Tonnes
                Gasifiers to be Burkhardt 165kW modules running on 6mm dia pellets 3 x 165kW = 495kW / Hr of electrical energy 7 x 260kW = 780kW / Hr of Thermal energy Stage 1 will be 3x 165kW gasifiers.  Total 495kW El and 780kW Th  Stage 1 Fuel consumption Tonnes / year in the gasifier (120x 165kW)  Nova N‐Plus pellet press  Nova belt drier 2.0 T / hr capacity Pipe for heat transfer from TaAnn facility. 1.0MWTH  Dried chip storage silo #1  70m3 / 25 Tonne capacity  Stor
   5   6   7   8   9   10   11   12   13   14   15