Hours of Gasifier operation p.a. 7000 360 Stage 1 Fuel consumption kg/ hr 2520 Stage 1 Fuel consumption kg / p.a. Personnel Total Total Hours MWHr Electrical Energy Summary Req. FTE mWhrs kWhrs Operating Installed kW Est cost Qty. Equipment required Burkhardt gasifiers 7 x 165kW, pellet fuel feeding conv, ash removal conveyor, spares kit, commissioning 3465 Total generated capacity 3 134.4 134400 7000 24 3,150,000.00 $ 3
100 200 250 300 350 400
Item #
NSFP ‐ ENERGY MASS BALANCE
2520 2520 0 25T
Tonnes
Gasifiers to be Burkhardt 165kW modules running on 6mm dia pellets 3 x 165kW = 495kW / Hr of electrical energy 7 x 260kW = 780kW / Hr of Thermal energy Stage 1 will be 3x 165kW gasifiers. Total 495kW El and 780kW Th Stage 1 Fuel consumption Tonnes / year in the gasifier (120x 165kW) Nova N‐Plus pellet press Nova belt drier 2.0 T / hr capacity Pipe for heat transfer from TaAnn facility. 1.0MWTH Dried chip storage silo #1 70m3 / 25 Tonne capacity Stor