P. 258
WORLD U18
Borehole Equipping
i) Pump sizing, supply and installation
ii) Trenching, pipe laying and connections
iii) Cable supply, installation, connection and control equipment installation
C) Status of the Works
Overall status is 100% complete as broken down below: 100%
KYEB
i) Borehole, drilling casing and gravel pack installation
100%
ii) Well development and test pumping
iii) Water testing, chemical analysis and well capping
100%
iv) Pump sizing, supply and installation
100%
100%
v) Trenching, pipe laying and connections
vi) Cable supply, installation, connection and
100%
control equipment installation
4. MOI INTERNATIONAL SPORTS CENTRE, KASARANI - HIGH AND LOW LEVEL WATER
TANKS AND WATER RETICULATION INSTALLATION WORKS
WP ITEM N0. D113 NB/NB/1601 JOB NO. 10141F
Main Contractor:
M/ S Walden East Africa Limited
P.O Box 8192-00200
KENYA YEARBO0K
Nairobi
A) Contract Data
EDITORIAL BOARD
i) Contract Sum
Kshs. 42,239,310.00
-
6th February 2017
-
ii) Commencement Date
iii) Completion Date
- 7th June 2017
High and low level water tanks
iv) % Work done - 100%
Water reticulation - 100%
Water irrigation system - 100%
v) Amount certifi ed - Kshs 42,239,310.00
vi) % of Amount Certifi ed - 100%
vii) Time Elapsed - 16 weeks
viii) % of period lapsed - 100%
B) Scope of Works
High and low level water tanks
i) Foundation Works and pump house
ii) Tank installation and pipe connections
iii) Pump set supply and installation
258 | ACTIVITIES AND OCCURENCES DURING WORLD U18 CHAMPIONSHIPS