                           B)    Scope of works

                           Upper warm area

                           i)   Excavation of the top layer of grass
                           ii)   Leveling and formation of the fi eld
                           iii)   Top red soil supply and spread
                           iv)   Manure mixed with red soil
                           v)   Culvers for drainage supply and fi xing
                           vi)   Grassing
                  KYEB
                           Lower warm area
                           i)   Excavation of the top layer of grass
                           ii)   Leveling and formation of the fi eld
                           iii)   Top red roil supply and spread
                           iv)   Carpet grass
                           v)   Drainage line
                           vi)   Grassing

                           C)    Works  progress

                           Upper warm area

                           General status is 100% complete as broken down below:
                     KENYA  YEARBO0K
                                  e following works have been done on upper warm –up area
                           i)
                               Excavation of the top layer of grass
                           ii)
                           iii)   Leveling and formation of the fi eld
                      EDITORIAL BOARD
                           iv)   Top red roil supplied and spread
                           v)
                               Manure mixed the red soil in progress –is now 100% complete
                           vi)   Culverts for drainage supplied ready for fi xing (the existing drainage levels are maintained ).
                           vii)   Grassing Culverts and construction of inspection chambers done to 100%.
                           Lower warm area

                           General status is 100% complete as broken down below:

                           i)     Excavation of the top layer of grass
                           ii)    Leveling and formation of the fi eld
                           iii)   Top red roil supplied and spread
                           iv)   Carpet grass done to 100% and watering done
                           v)    Drainage line opened and repair done
                           vi)   Grassing in progress to 100% complete