Page 32 - LESSONS LEARNED BY MADARFM
P. 32
REAL TIME ISSUES (AL RABIA COMPOUND)
Concern Area Issue Cause Risk Impact on Customer
3. Sewage A. No gravity (pump) - Bad Design Drainage overflow and Customer Loyalty
Connection connection for the main - No Involvement of the flood on the streets. Customer Damage
sewage drain. Operator during Design Customers to relocate Brand Damage
Phase from home to hotel due Reputation Damage
to health risk. Severe Injuries
Proper commissioning
and testing of systems.
To have two pumps,
one duty, one standby
for failure and
maintenance
requirements.
32