H.4 Earthwork support
1. Earthwork support shall be given in accordance with claUses D. 13-14 sUbject to the
following:
a. Earthwork support to preliminary trenches shall be so described.
b. Earthwork sUpport below the level of the base of existing foUndations (meas ured to
back, front and both ends of the Underpinning and also between each section of the
underpinning) shall be so described.
H.5 Concrete, brickwork and asphalt
All other work in connection with Underpinning shall be given in accordance with the nules of the
applicable work sections.