Page 312 - Eden Meadow 35 houses application as of 12 October
P. 312

Land to the Rear of Eden Meadows, Newington
                                                                                         Ref: PL/GB/13776
                                                                   AM Peak Hour
                                                  Arrivals          Departures              Total
                          Site Access (W)            2                   4                    6
                          Site Access (E)            3                   8                    11
                          Sheppey Way                0                   1                    1
                          A2 Key Street              1                   1                    2
                          Chestnut Street            0                   0                    0
                          A249                       2                   5                    7
                                                                   PM Peak Hour
                                                  Arrivals          Departures              Total
                          Site Access (W)            4                   3                    7
                          Site Access (E)            7                   5                   12
                          Sheppey Way                1                   1                    2
                          A2 Key Street              1                   1                    2
                          Chestnut Street            0                   0                    0
                          A249                       5                   3                    8

                        Table 5-6: Summary of Vehicle Trips entering the A2 / A249 / Bobbing Hill / Sheppey Way /
                                                    Chestnut Street Roundabout


               5.3.4    It is noted that a total of 11 trips will interact with the A2 / A249 / Bobbing Hill /
                        Sheppey Way / Chestnut Street (Key Street) roundabout during the AM peak hour,
                        and 12 trips during the PM peak hour, equating to an additional movement every
                        five  minutes  on  average.  It  is  not  considered  that  this  would  have  a  material
                        impact on the operation of the junction.

               5.3.5    It  is  further  noted  that  KCC  has  recently  been  awarded  Housing Infrastructure
                        Funding from Government to enable the Key Street Roundabout to be upgraded
                        to accommodate the housing growth provided for by the adopted Local Plan.