Page 12 - SAMPLE Proposal 2
P. 12

➢  All custom cabinetry (& garage bath cabinetry kit) shall be handled as an allowance item and all
               final selections shall be approved by the homeowner in BuilderTrend.

               COUNTERTOPS
            ➢  Supply and install solid surface countertops for the following areas: kitchen perimeter, kitchen
               island, master bathroom vanities (2), master shower bench (top only), all kids’ bath tops.

            ➢  The butler cabinet shall receive a butcher block style countertop.
            ➢  The master bath tub (undermount style) area and shower curb shall be solid surface material.
            ➢  Where a tile backsplash is not scheduled, a standard three-inch backsplash of the same material
               shall be installed.
            ➢  All final countertop pricing shall be based on actual field dimensions. Final pricing will also in-
               clude all top cut-outs, taxes, delivery, and installation charges.
            ➢  All countertops (material, fabrication, and installation) shall be handled as an allowance item
               and all final selections shall be approved by the homeowner in BuilderTrend.

               TILE
            ➢  Butler pantry floor.
            ➢  Breezeway floor.
            ➢  Master bathroom:
               o  Floor (herringbone pattern)
               o  Steam shower ceiling, floors, and walls including 1 wall niche with two shelves; niche to be
                   field located. Shower room to have 1 wall-to-wall bench.
            ➢  Kitchen:
               o  Backsplash above all perimeter countertops. Includes recessed shelf above the range with
                   specialty tile inlay.
            ➢  Laundry room floor.
            ➢  All (4) upstairs bathroom floors and tub/shower walls including one small niche for each shower
               – location TBD.
            ➢  Garage apartment – acrylic shower base, two walls only with standard subway tile / brick pat-
               tern.
            ➢  Note: This scope of work anticipates standard patterns such as brick joint and straight lay.
               Other patterns/designs and specialty material could increase the cost of materials and/or instal-
               lation.
            ➢  All tile materials shall be handled as an allowance item and all final selections shall be approved
               by the homeowner in BuilderTrend.

               PAINTING
            ➢  This scope of work includes a full-house re paint including walls, ceilings, doors, windows, and
               trim.
            ➢  All unpainted and unprimed new construction materials will be primed prior to painting.
            ➢  Painting two coats of interior latex (Sherwin Williams ProMar 200 or similar) on all new con-
               struction interior ceilings and walls.
   7   8   9   10   11   12   13   14   15   16